Bear Creek Upper Hydro Road

Sunshine Coast Natural Resource District
Road Details
Location
Condition Good Condition (Last updated 218d)
Condition Details Road is 2WD driveable in most cases or easily driven in a 4WD.
Closures No Posted Closures
Length 1.96km
Owner
Waypoints Download GPX
Road Description

A new road for the Bear Creek Hydro Project: https://cclinfrastructure.cclgroup.com/cases/bear-creek-hydro-project/.

Road Bulletins

No recent bulletins.