Alan Smithee

Join Date: Oct 10, 2024

Location: Prince George BC

Contribution Points: 102

Bulletins: 17
(6 points each)
Photos: 0
(2 points each)

Recent Contributions

CROYDON-TETE JAUNE

Good road, graded this spring. 2WD passable.

Alan Smithee - Jul 01, 2025
16d
CASTLE CRK/CP004

Private industry road. Locked gate at bridge.

Alan Smithee - Jul 05, 2025
16d
CASTLE CRK-MAINLINE

Some road surface erosion but 2WD passable. May require high clearance in some spots. Road deactivated and blocked at 7.8 km

Alan Smithee - Jul 05, 2025
16d
GOAT RIVER

Road hasn't seen a grader yet this summer but is holding up well. Minor brush and potholes. 2WD passable.

Alan Smithee - Jul 01, 2025
22d
CHIEF

Well maintained with active industry. Few section of potholes around 40-50 km.

Alan Smithee - May 22, 2025
28d
DAVIE-MUSKEG FSR

Graded recently. 2WD Passable.

Alan Smithee - Jun 06, 2025
35d
R07566-G

Maintained last winter for industry. Bridge at 2.7km repaired.

Alan Smithee - Jun 13, 2025
35d
LOWER GOAT

Hasn't been maintained in a couple years. 2WD passable in dry conditions but gets sloppy after rain.

Alan Smithee - Jun 18, 2025
35d
Blackwater Road

Paved MOTI road until 27.5 km

Alan Smithee - Jun 18, 2025
36d
Canoe Reach Marina

Graded in spring. 2WD passable.

Alan Smithee - May 18, 2025
36d
EAST CANOE

Graded in spring, 2WD passable.

Alan Smithee - May 18, 2025
36d
MCBRIDE PEAK

Graded with a few larger stones.

Alan Smithee - Sep 27, 2024
36d
BEAVER FSR

Actively maintained. Graded sometime this spring.

Alan Smithee - Jun 07, 2025
36d
DAVIE-CROOKED FSR

Passable with 2WD vehicle. Lots of dead and down trees.

Alan Smithee - Jun 14, 2025
36d
DAVIE-BEAR LAKE FSR

Has not been graded yet this spring. Some sections of rough potholes.

Alan Smithee - Jun 14, 2025
38d
DAVIE LAKE FSR

Good Condition. Active Industry.

Alan Smithee - Jun 14, 2025
38d
FINLAY-CHUNAMON

Recently graded. Road construction 18- 32km with minor delays.

Alan Smithee - Jun 05, 2025
42d