Alan Smithee

Join Date: Oct 10, 2024

Location: Prince George BC

Contribution Points: 132

Bulletins: 22
(6 points each)
Photos: 0
(2 points each)

Recent Contributions

MUSKEG.

Smooth driving. 2WD passable.

Alan Smithee - Aug 17, 2025
1d
FSR6480.00

Smooth driving with a few pothole locations. Active fire salvage along the road.

Alan Smithee - Aug 17, 2025
1d
CARRIER

Mostly smooth driving with some soft spots and potholes. May need 4x4 in very wet conditions.

Alan Smithee - Aug 17, 2025
1d
TEARDROP

Recently graded from 0km to junction with Chief 200 FSR.

Road being deactivated from 55.5 to 63.5km (459 to 467km in the bush).
Workers said the...

Alan Smithee - Jul 30, 2025
14d
EAST TWIN-MAINLINE

Heavily brushed in and cross ditched. Deactivated at 0.84 km [since 2019] and no vehicle access past first bridge. Hiking only. All bridges after 0.84...

Alan Smithee - Jul 26, 2025
20d
CROYDON-TETE JAUNE

Good road, graded this spring. 2WD passable.

Alan Smithee - Jul 01, 2025
43d
CASTLE CRK/CP004

Private industry road. Locked gate at bridge.

Alan Smithee - Jul 05, 2025
43d
CASTLE CRK-MAINLINE

Some road surface erosion but 2WD passable. May require high clearance in some spots. Road deactivated and blocked at 7.8 km

Alan Smithee - Jul 05, 2025
43d
GOAT RIVER

Road hasn't seen a grader yet this summer but is holding up well. Minor brush and potholes. 2WD passable.

Alan Smithee - Jul 01, 2025
49d
CHIEF

Well maintained with active industry. Few section of potholes around 40-50 km.

Alan Smithee - May 22, 2025
55d
DAVIE-MUSKEG FSR

Graded recently. 2WD Passable.

Alan Smithee - Jun 06, 2025
62d
R07566-G

Maintained last winter for industry. Bridge at 2.7km repaired.

Alan Smithee - Jun 13, 2025
62d
LOWER GOAT

Hasn't been maintained in a couple years. 2WD passable in dry conditions but gets sloppy after rain.

Alan Smithee - Jun 18, 2025
62d
Blackwater Road

Paved MOTI road until 27.5 km

Alan Smithee - Jun 18, 2025
63d
Canoe Reach Marina

Graded in spring. 2WD passable.

Alan Smithee - May 18, 2025
63d
EAST CANOE

Graded in spring, 2WD passable.

Alan Smithee - May 18, 2025
63d
MCBRIDE PEAK

Graded with a few larger stones.

Alan Smithee - Sep 27, 2024
63d
BEAVER FSR

Actively maintained. Graded sometime this spring.

Alan Smithee - Jun 07, 2025
63d
DAVIE-CROOKED FSR

Passable with 2WD vehicle. Lots of dead and down trees.

Alan Smithee - Jun 14, 2025
63d
DAVIE-BEAR LAKE FSR

Has not been graded yet this spring. Some sections of rough potholes.

Alan Smithee - Jun 14, 2025
65d
DAVIE LAKE FSR

Good Condition. Active Industry.

Alan Smithee - Jun 14, 2025
65d
FINLAY-CHUNAMON

Recently graded. Road construction 18- 32km with minor delays.

Alan Smithee - Jun 05, 2025
69d