Moved the 21.5 km impasse from Shovelnose Creek to Turbid Creek as it was incorrect. Blocked by lock blocks between washout and TFL 780 with opening wide enough for a bike I think. 18.5 km rock slide has been cleared and flattened. Almost like nothing happened unless you look at the slope side. Must have been a major one. Okay condition. Same old full of potholes all the way. Aired down on snow tires and wasn't concerned.
Conditions may change. Reports could be inaccurate. I use these reports as a general idea. Always be prepared. Only one way to find out what's it like currently.