Lois River FSR

Sunshine Coast Natural Resource District
Road Details
Location
Length 9.75km
Condition
0.0km to 9.8 km Impassable 829d ago
Owner
Closures No Posted Closures
Waypoints Download GPX
Road Description

No description.

Road Bulletins
Joel Nordman reported on: Aug 18, 2022
Bridge is permanently removed across the Lois River. Road is overgrown, road bed is good.