Kwoiek Creek Branch 3

Cascades Natural Resource District
Distance
5.60 km
Last Road Report
May 18, 2025
Closures
No Posted Closures
Location
Not Specified
Permit Holder
Not Specified
Waypoints
Conditions
Start to 0.3 km
Heavily Degraded
201d ago
Description

Bridge in as of May 18th, 2025,Created some time in the 1980's when logging expanded deep into the Kwoiek Creek Valley. There has been no logging since and the roads have deteriorated heavily as a result.

Road Bulletins
Tim Argast reported on: May 18, 2025
Only went as far as bridge over Kwoiek Creek. Road is very overgrown. Impassable by vehicle but might be ok on foot. Bridge still in