Kwoiek Creek Branch 3
Cascades Natural Resource District

Road Details
Location | |
---|---|
Length | 5.60km |
Condition |
0.0km to 0.3 km | Heavily Degraded 66d ago |
Owner | |
---|---|
Closures | No Posted Closures |
Waypoints | Download GPX |
Road Description
Bridge in as of May 18th, 2025,Created some time in the 1980's when logging expanded deep into the Kwoiek Creek Valley. There has been no logging since and the roads have deteriorated heavily as a result.