Bush River FSR

Selkirk Natural Resource District
Distance
103.96 km
Last Road Report
Aug 18, 2025
Closures
No Posted Closures
Location
Bush River FSR
Permit Holder
Timber Sales Manager Okanagan-columbia
Waypoints
Conditions
Start to 64.2 km
Good Condition
109d ago
64.2 to 66.3 km
Somewhat Degraded
109d ago
66.3 to 100.4 km
Good Condition
109d ago
100.4 to 104.0 km
Impassable
109d ago
Description

No description.

Road Bulletins
Steven Noel reported on: Aug 18, 2025
Usual fast shape to Bush Harbour (km 43) then narrower but still good to the Sullivan junction (61.5). At ~km 63, shortly before the Valancienne River, there is a 2-300m stretch that has been raised significantly due to previous washouts. This section is quite muddy and rutted at present and the ruts bottomed out our SUV requiring an extraction and second attempt to get through. 2WD/any vehicle with little clearance is likely to have a challenging time here. This is the worst I have seen the main Bush FSR in my 10 times on it. Hopefully in time it will dry out and perhaps they'll take a grader to it but it seems no active hauling up here right now.
Brent DeWolff reported on: May 31, 2025
Driveability = 2wd to bridge-out location at 100km. Alder is taking over between 96-100km (probably taking road within a couple years). One shallow mudpit along this section.
Josiane Begin reported on: Jul 09, 2024
Excellent condition, 2WD driveable until km 95. Then it becomes overgrown, but still driveable if you do not care about your paint. Bridge is removed at km 100.5.
Steven Noel reported on: Aug 31, 2022
Road is in good shape EXCEPT for the bridge being removed at 100.5km. Road is foot access only with a challenging ford from there--may be impassable in high water and accidents have occurred here.