Hixon Creek FSR

Sea To Sky Natural Resource District
Road Details
Location STAWAMUS/INDIAN RIVER
Condition Good Condition (Last updated 152d)
Condition Details Road is 2WD driveable in most cases or easily driven in a 4WD.
Closures No Posted Closures
Length 8.16km
Owner District Manager Squamish (dsq)
Waypoints Download GPX
Road Description

No description.

Road Bulletins
Sean Caulfield reported on: Apr 20, 2024
Short steeper section, a few loose rocks but not too bad
Worker installing flagging along the side of the FSR (truck just ahead out of picture). Also note the yellow-flagged survey pegs on the bank which I think may be the alignment for the new LNG pipeline
Large staging area cleared at junction with Indian River FSR. Some parked heavy equipment, even a fuel-up station.
Agree with the last report, any SUV should make it but I'd recommend decent tires as well as a full size size spare and tire repair kit as it >30km back to pavement. On my return a crew was installing stakes and flagging along the side of the road, I expect it may be closing to the public very soon. Large staging area has been cleared at the junction with Indian River FSR.
Sean Patterson reported on: Feb 18, 2024
higher clearance 2WD. Is being maintained as of Feb for the gasline construction. Up to the existing permanent gate
Jeff Han reported on: Sep 16, 2023
the Road is in relatively good shape, no need to 4x4 HC, any 4x4 can make to the gate. Note: it's not a normal locked open gate, it's wired gate that you can't even pass a backpack through