OSM | BCWFS | GovCan

Hixon Creek FSR

Sea To Sky Natural Resource District
Distance
8.16 km
Last Road Report
Apr 20, 2024
Closures
No Posted Closures
Location
Hixon Creek FSR
Permit Holder
District Manager Squamish (dsq)
Waypoints
Conditions
Start to 8.2 km
Good Condition
519d ago
Description

No description.

Road Bulletins
Sean Caulfield reported on: Apr 20, 2024
Short steeper section, a few loose rocks but not too bad
Worker installing flagging along the side of the FSR (truck just ahead out of picture). Also note the yellow-flagged survey pegs on the bank which I think may be the alignment for the new LNG pipeline
Large staging area cleared at junction with Indian River FSR. Some parked heavy equipment, even a fuel-up station.
Agree with the last report, any SUV should make it but I'd recommend decent tires as well as a full size size spare and tire repair kit as it >30km back to pavement. On my return a crew was installing stakes and flagging along the side of the road, I expect it may be closing to the public very soon. Large staging area has been cleared at the junction with Indian River FSR.
Sean Patterson reported on: Feb 18, 2024
higher clearance 2WD. Is being maintained as of Feb for the gasline construction. Up to the existing permanent gate
Jeff Han reported on: Sep 16, 2023
the Road is in relatively good shape, no need to 4x4 HC, any 4x4 can make to the gate. Note: it's not a normal locked open gate, it's wired gate that you can't even pass a backpack through