Explore
Bulletins
Updates
Directory
Login
Wolverine-Moose Connector - Bulletin
Neil Sc
reported on:
Jul 13, 2023
Bridge between Km .5 and Km 1 is out and not passable with a vehicle
Replies
Login to Add
Francis Bailey
-
358d
Thanks Neil, I've fixed this road up as it was overlapping the Wolverine Pass FSR and added a bridge out icon! How were the roads leading up to the bridge being out? Easily driven?
Neil Sc
-
357d
The approach to the bridge out is starting to grow in quite a bit.
Go Back