Used this road to climb Peak 2850 (Ewin NW1). The bridge is out at 10 KM. We parked here (2wd) and continued on bikes to the next pulled bridge at ~11 KM. There is a dilapidated walking bridge that is still useable at the second bridge crossing. We then biked up Branch H which goes left 100 m after the second pulled bridge