Seb Gulka

Join Date: Sep 25, 2025

Location: Not Specified

Contribution Points: 40

Bulletins: 6
(6 points each)
Photos: 2
(2 points each)

Recent Contributions

Only went to 8.5km mark. Has some potholes as you near the lake but way better than when I was last up 2y ago. We followed a minivan down, so that tel...

Seb Gulka - Nov 09, 2025

Drivable in any vehicle, although gate at the start (junction with main Jones Lake FSR) is locked Nov 1-Apr 30 so we walked

Seb Gulka - Nov 09, 2025

Perfect condition until the switchback around 1.4km. There the road would still be easily drivable in a moderate clearance 4x4 (likely AWD) but become...

Seb Gulka - Nov 09, 2025

Excellent condition, as expected for a hydro road, just loose rocks in places. High clearance not needed, but it is mildly steep (sign said >18%) in p...

Seb Gulka - Oct 06, 2025

Doable in my stock '08 Honda CRV (w/ running boards). A couple mild cross ditches and some rocks. Stopped at the junction with Paleface 2300. At this ...

Seb Gulka - Sep 27, 2025

Great road, doable in any vehicle. Some rocks across the road ~5km after the junction with Mud Creek Br 01 that we easily moved aside.

Seb Gulka - Sep 23, 2025