Gavin
reported on:
Jun 28, 2026
Decent condition pretty much whole way. Gate before bridge open. Sign says "Active area. Gate locked daily without notice." Bridge at start has deck boards looking a little degraded. Was concerned at first, but watched conservation officer drive over with F250. 2.5 km washout cleared. Not the best job, but passable. Small ditch forming around 2.7 km. No issues. Deactivation ditch at the end.