Collie Creek FSR
Selkirk Natural Resource District
Road Details
Location | Blaeberry Creek |
---|---|
Length | 14.57km |
Condition |
0.0km to 14.6 km | Somewhat Degraded 136d ago |
Owner | Shuswap Band |
---|---|
Award Date | Apr 16, 2018 |
Closures | No Posted Closures |
Waypoints | Download GPX |
Road Description
No description.
Road Bulletins
Bridge over Collie CK at KM 10.9 has been removed. No vehicle crossing possible, after the jct where Amiskwi branches off, water bars become much more steep and deep, wouldn’t attempt with anything other than a high clearance 4x4.
Surprisingly the bridge over Ensign CK at KM1.5 was still in place despite info it had been pulled. Some swales, but otherwise still very passable.
Swung off towards Amiskwi, didn’t explore up Collie CK to see what shape that road is in.
Swung off towards Amiskwi, didn’t explore up Collie CK to see what shape that road is in.
This is the Collie Creek FSR. The bridge over Collie Creek is in for the first time in 15 years, and the roads have been roughed in to HC 4x4 standards (pit run, very muddy when wet). We travelled into all 3 headwaters of Collie Creek over 2 days, scrambling peaks at the western extremity of the Wapta Icefield.