Phelix Creek Branch 4

Sea To Sky Natural Resource District
Distance
2.07 km
Last Road Report
Oct 04, 2025
Closures
No Posted Closures
Location
Phelix Creek Branch 4
Permit Holder
District Manager Squamish (dsq)
Waypoints
Conditions
Start to 1.4 km
Good Condition
62d ago
1.4 to 2.1 km
Somewhat Degraded
62d ago
Notices
Description

No description.

Road Bulletins
Tareef Dedhar reported on: Oct 04, 2025
Easy after the initial bridge, but the last few hundred metres are more overgrown with a couple rougher water bars. good crossover or 4x4 for that last little bit. much more parking before. the point where the road changes is estimated
Ryan MacD reported on: Aug 01, 2025
Unwise to park directly at trailhead, best to park in large open area in last cutblock roughly 100m below - both due to lack of space, and considerable glass / debris remaining from removal of burned out vehicle.
Joseph Logelin reported on: Jun 29, 2025
If you've made it this far in then you can easily make it to the TH. FSR got better at this point and bridges were in good condition
laurent gervais reported on: Jun 14, 2025
Very good conditions
Donal Dignan reported on: Dec 26, 2023
Good condition all the way to the end of the road and bridges are good. No features that would make this difficult in summer. Only difficulty is ice and snow coverage. No vehicles had driven beyond the start of this section of FSR. All parked below second bridge at 4.4 km on Phelix FSR. Vehicles stopped where snow coverage was getting deeper. Others may drive higher based on vehicle, traction, skill, risk tolerance.