Some localized degradation from where the river came up onto the road around the 3.5km mark, otherwise good condition. Road is washed out at 11.5km, likely from recent heavy rains and impassable.
The washout at 15 km is still there. Minor creek crossing before bridge. The section just before the creek crossing is a little rough. Made it across in my Pilot.
Washout before bridge at 15 km. I didn't attempt to cross it, but should be easy in 4x4 HC. Unsure if I could pass with increased angle from the snow accumulation. Made it here in my AWD Pilot Trailsport. A few potholes hidden under the snow in the last few km to here since there were no tire tracks.
In good condition, at least until the Sootip turnoff. A sign at the entrance says the area is closed to motor vehicles from Dec. 1 to May 31, but there doesn't seem to be anything about this online.
There was about a foot of snow on the way in this morning, but after a kilometre in the road was suddenly plowed. We drove all the way to Branch 5 where we ran into a logging crew who informed us they were plowing up to ~2km. Their grader was still working the road so we opted to park at the base. Soo River FSR was not plowed at all beyond this point