No vehicle profiles yet.
Very, very steep in some places but in good shape to roughly 600 meters, which is beyond where the end of the road is shown in the map. That's becaus...
Andrew Enns - Oct 17, 2026Good condition until the turnoff to R0166876, up which there is new logging, so the road has been fixed up to this point. Impassable beyond that.
Andrew Enns - Oct 17, 2026Smooth sailing up to the R0166870 turnoff at 1.5 KMs. New logging is happening up R0166876 so the road up to the turnoff for R0166870 is in great sha...
Andrew Enns - Oct 17, 2026Gate locked at 0 KM. There's a sign for active logging at the gate. The company working up there, per the sign, is Maharg Contracting/Senica Logging...
Andrew Enns - Oct 17, 2026In excellent condition all the way to the "Mamquam South Mainline turnoff". Any car could do it. Basically avoid the potholes and sometimes sketchil...
Andrew Enns - Oct 10, 2026The road climbs very steeply almost right from the start, and is pretty much clear sailing up to KM 5 with zero waterbars or major obstructions. Betw...
Andrew Enns - Oct 02, 2026Other than a number of overgrown sections that thankfully have somewhat of a discernible path going through the alders, this road is easy and pleasant...
Andrew Enns - Aug 31, 2025A narrow mining track that continues beyond the former Nahatlatch Fire Lookout site. The 2023 Kookipi Creek Fire burned the forest around it until ju...
Andrew Enns - Aug 31, 2025In pretty good shape for the most part, with a few rocky spots. A crossover would likely make it as long you picked your route carefully and avoided ...
Andrew Enns - Jul 02, 2026Found conditions inline with the previous report by Mike Hiker. To expand on his description however, I should note that beyond the hydro dam, and es...
Andrew Enns - May 23, 2026The road surface looks to be unchanged as far as we drove, which was to the first of the two bridges over Charles Creek. However, just under 1.5 KMs ...
Andrew Enns - Mar 01, 2026Was out for a casual rip up East Harrison and noticed the gate at the start of Cogburn Creek FSR was open after having been re-closed for new logging ...
Andrew Enns - Mar 01, 2026At least one big tree down over it and some of it is heavily rutted from water flowing over it. But easily traveled on foot.
Andrew Enns - Aug 31, 2025Road is improved for salvage logging up to 990 vertical meters, only about 200 vertical meters shy of the lookout site. Unfortunately, the upper sect...
Andrew Enns - Aug 31, 2025Not passable in any wheeled vehicle, and likely never was. This was a rudimentry skidder track, not a road, that I believe was punched in in the earl...
Andrew Enns - Aug 31, 2025Road is quite smooth and easy driving up to the 37.5 KM marker or so (basically right after the bridge where the standard approach up Yalakom Mountain...
Andrew Enns - May 18, 2025Road still washed at KM 3. A quad could get around, but nothing bigger than that. Unfortunately the washout, which goes all the way down to Spuzzum ...
Andrew Enns - Mar 29, 2025Gate at the start of the road is gone. Not open, but gone completely. I drove up about 2 kms but didn't go any farther since I was only in my little...
Andrew Enns - Mar 29, 2025