Road in good shape up to bridge out. Lots of logging activity. Carry a radio.
Luca Mullins - Aug 04, 2026In good shape up to end of marked road on this map (i.e. 21.45 km) and perhaps slightly further. Approx. 8 meter wide road grade (wide enough to pass ...
Luca Mullins - May 08, 2026Road in good shape. Average rocks & potholes. Dusty. Bridge is out at 16 km on Finn-Tum FSR until August 14th so no access south (i.e. to Tum Tum main...
Luca Mullins - Aug 04, 2026High clearance 4WD vehicle required to access the mine site. Steep, loose rock and narrow shelf road sections.
Derek Wallace - Jul 29, 2026Good road conditions for moderate clearance 4WD up to the end of the road. Some minor water bars around 8km but passable.
Derek Wallace - Aug 02, 2026Good road conditions. 2WD passable. No recent grading but very little traffic.
Derek Wallace - Aug 05, 2026Road conditions are good as timber licensee is now hauling logs from approximately 40km north to Valemount. Lots of truck traffic and very dusty when ...
Derek Wallace - Aug 11, 2026Start of the trail is steep, but not difficult. Only a short distance you come across a steep rocky section needing HC4x4. After that there are some w...
Steve Parkinson - Jun 28, 2026Extremely bushy, had to clear some medium-sized trees that had fallen then opens up with spectacular views down to the ocean below. Good cell service ...
Sean Caulfield - Aug 09, 2026Roadbed in good condition but very bushy. Had to clip/saw several alders & clear a few fallen trees.
Sean Caulfield - Aug 09, 2026This road clearly doesn't see much travel but the roadbed is still in good shape. Bush starting to encroach further along. I left this road at 10km on...
Sean Caulfield - Aug 09, 2026Wide Main in good condition all the way to the Koprino campsite at Spencer Cove. Several people appeared to be living at the campground with RVs & she...
Sean Caulfield - Aug 09, 2026Drove Northbound, in reasonable condition up to bridge at 12km, which is not rated for cars/trucks (1000lb limit), nor wide enough for most, and had a...
Thomas Dubouchet - Aug 09, 2026Previous report is inaccurate. The last few km have been recently graded but are still potholes. The first few km still has a few waterbars and cross ...
Stefan Feldmann - Aug 09, 2026There are 76 water bars on this road (basically one every 100m). I was able to easily drive to the end in a stock INEOS Grenadier (didn't need to even...
Peter Hudson - Aug 08, 2026No change from Steven's report, just updating road condition to green.
Also tried to add an Impasse for the minor debris flow that blocks the road at...
Very steep FSR, 2WDs do not attempt, you will not get enough traction. HC 4x4 recommended. Lots of sharp rock on the FSR, AT tire seem necessary. We d...
William Shi - Aug 09, 2026Good conditions till the end.
AWD can make it almost a kilometer before the end.
We rode loaded ADV bikes from Terrace to Telkwa, so heading down from 10.4 km on this map. At 2.6 km there is a water crossing for about 130 ft, and i...
Jesse Lloyd - Aug 04, 2026Road narrows into a twin track. At about 1.5km the creek has blown out the culvert and has overtopped the road. Past that, more creeks have overtoppe...
Jesse Lloyd - Aug 04, 2026Gate was closed, but not latched or locked. Just enough room to turn around at gate.
Gavin - Aug 09, 20262 km gate open. Good condition to end. Some sections of gravel that may limit speed, but not an issue. 24 km gate moved further up onto MEAGERCR S. Al...
Gavin - Aug 09, 2026